Our Facility was originally home to the North Division 6 cinemas.  When the former owners came across the building they knew it was a perfect building for what they had envisioned.  Adana Harris designed the set of the facility in order to ensure maximum benefits from the space.  And Although Adana was 9 months pregnant at the time she made certain to be there during every step of construction.

 

Construction was a long process due to obvious building constraints.  All of the theatre floors would have to be leveled therefore tons of dirt would need to be brought in. All of the inset equipment would have to be done at this time, therefore the 42’ X 42’, the T shaped foam pit and the vault runways and the 50’ tumble trak would have to be pre measured for correct depths and concrete poured to specs.  Explaining to the builders what all of these things were was probably the most difficult part of the entire endeavor.  The results however were well worth it.